Approved sample · Written specification

From yarn reference to finished order

Understand the cashmere production stages: material preparation, knit or woven construction, assembly, finishing, inspection and dispatch planning.

Production window

35–45

Indicative days; schedule confirmed for the order

Process stages

06

Material through dispatch

Quality reference

Agreed

Tolerances agreed in the specification

Approval basis

Sample

Finished sample and order documents

TWO FABRIC ROUTES

Knitted garments and woven products start differently.

Choose the construction for the intended product. The knitwear route shapes fabric through stitches; the woven route interlaces warp and weft. Each needs its own material, dimensions and finishing review.

KNITWEAR ROUTE

Panel development · Assembly · Finishing

WOVEN ROUTE

Warp & weft · Edge finishing · Appearance review

FROM INPUTS TO FINISHED GOODS

The six-stage production pathway

STAGE 01 / 06   ·   INPUT VERIFICATION

Material review & preparation

APPLIES TO: KNITWEAR & WOVENS

Confirm the yarn article, shade and lot against the approved brief. Review composition and any supporting supplier records required by the buyer. Material preparation is selected for the construction; specialised testing is included only when agreed.

YARN ARTICLE

Confirm for the order

MATERIAL PREPARATION

Appropriate to the yarn

An oatmeal yarn cone, knitted sample and loose fibres on a worktable

STAGE 01 // YARN & MATERIAL REFERENCES

Warp and weft construction on a small wooden sample loom

STAGE 02 // FABRIC CONSTRUCTION

STAGE 02 / 06   ·   FABRIC FORMATION

Knitting or weaving

KNITWEAR: GAUGE REVIEWED WITH THE YARN

WOVENS: COUNT AND WEAVE REVIEWED TOGETHER

The intended product determines the fabric route. Knitted garments may be developed through shaped panels and appropriate stitches; woven scarves or homeware require a suitable warp-and-weft construction. The sample establishes the appearance, weight and dimensions to review.

PRODUCT-SPECIFIC CONSTRUCTION

Review the relationship between material, fabric formation and assembly on a physical sample before the production approach is approved.

STAGE 03 / 06   ·   ASSEMBLY PRECISION

Assembly & detail application

APPLIES STRICTLY TO: FASHIONED KNITWEAR

Where the product uses separate knitted panels, assembly must suit the yarn, gauge and intended seam. Necklines, sleeves, openings and trims are reviewed as part of the complete garment rather than treated as independent decorative features.

  • ▪Assembly is selected for the intended construction.
  • ▪Yarn, gauge and seam requirements are reviewed together.
  • ▪The finished sample establishes the feel and appearance to approve.
Hands reviewing the inside sleeve seam of a pale blue knitted sample

STAGE 03 // PANEL ASSEMBLY

Hands smoothing a supported knitted garment on a drying rack, an illustrative finishing scene

STAGE 04 // WASHING & FINISHING

STAGE 04 / 06   ·   WET PROCESSING

Washing & finishing review

APPLIES TO: KNITWEAR & WOVENS

Finishing changes handle, dimensions and surface appearance. Review the finished sample before confirming the product specification. Process requirements are selected for the material; no universal chemical-free or water-chemistry claim is made for every article.

FINISHING METHOD

Selected for the material

PROCESS REQUIREMENTS

Agreed with the brief

STAGE 05 / 06   ·   FORM STABILIZATION

Measurement & final presentation

APPLIES TO: KNITWEAR & WOVENS

Compare the finished garment with the approved measurements and tolerances. Review proportions, visible appearance and the required finish. A tolerance is an agreed product criterion, not a promise that a natural-fibre garment will never change through use or care.

MEASURE AGAINST THE APPROVAL

Review the finished dimensions at the agreed measurement points. Any tolerances should be recorded with the approved product specification.

A measuring tape aligned along a charcoal cardigan sample

STAGE 05 // MEASUREMENTS & PRESENTATION

A folded cream knit being protected with tissue before packing

STAGE 06 // INSPECTION & PACKING

STAGE 06 / 06   ·   RELEASE & LOGISTICS

Inspection, packing & dispatch

APPLIES TO: KNITWEAR & WOVENS

Review the completed order against its agreed inspection and presentation requirements. Labels, packing instructions, quantities and shipment details should be checked before handover to the agreed courier or freight route from Kathmandu.

INSPECTION SCOPE

Agreed for the order

PACKING INSTRUCTIONS

Confirmed before dispatch

DEVELOPMENT PLANNING

Illustrative gauge and product directions

Use these examples to discuss a starting construction. They are not a machine inventory, stock promise or daily output commitment. The actual combination is established through development.

Discuss the production window required by your collection

Development directionIllustrative yarn constructionStitch / weave directionProducts to discussPlanning basis
3GG Chunky2/16 Nm · 6 to 8-plyFisherman rib, chunky cable braid, basket weaveWinter overcoats, heavy cardigans, ski turtlenecksOrder-specific
7GG Heavy2/26 Nm · 4-plyEnglish rib, moss stitch, honeycomb, cardigan stitchSubstantial crewnecks, winter wraps, travel hoodiesOrder-specific
12GG Classic2/28 Nm · 2-plyPlain jersey, Milano rib, engineered needle dropsCore luxury crewnecks, V-necks, fine cardigansOrder-specific
16GG Fine2/48 Nm · 2-plyMicro-jersey, high-twist rib trims, multi-color intarsiaSpring lightweight knits, polo collars, luxury teesOrder-specific
18GG Gossamer1/60 to 2/80 NmFeatherweight jersey, delicate pointelle openworkSecond-skin base layers, transparent knit shellsOrder-specific
Hand-Loom Woven60/1 to 200/2 RingDiamond eyelet weave, 2/2 twill, hand eyelash fringesChyangra ring-shawls, travel stoles, fringed throwsOrder-specific

* Examples support the development discussion. Product availability and production scheduling are confirmed for the individual order.

Discuss a construction requirement before committing to a sample.

Define the evidence you need

Quality requirements before production begins.

Inspection criteria should be understandable to both teams. Identify what must be checked, how it will be assessed and which reports are part of the agreed scope.

Dimensional stability requirements

Agree the dimensional-stability requirements and care instructions for the selected material. If a named test is required, confirm the method and reporting scope before production.

Surface appearance & wear expectations

Material, construction, finishing and use affect surface appearance. Establish the intended performance requirements and any test programme for the individual product.

Colour performance requirements

Colour performance requirements should be matched to the material and intended use. Ask which supplier information or agreed test results support the relevant claim.

ORDER REVIEW CHECKLIST

REQUIREMENTS CONFIRMED BEFORE PRODUCTION

Record the criteria behind approval.

DIMENSIONS & CARE

Agree the test scope

SURFACE APPEARANCE

Review material evidence

ASSEMBLY & FINISH

Assess the sample

COLOUR PERFORMANCE

Confirm the requirement

Ask which tests and documents are relevant and available for your order.

SHIPMENT REVIEW

Prepare the next production discussion

Bring your product specification to the conversation.

Share drawings, material references, quantities and the intended delivery window. Sampling is indicative at 7–14 days; the actual development and production schedules are confirmed separately.

▪ Specification-led construction

▪ From 12 pcs / style and colorway

▪ Dispatch planning from Kathmandu

Resolve conflicting specifications before starting

Your approved sample, measurement chart, colour reference, label artwork and packing instructions should describe the same version. Resolve conflicting notes and confirm who can approve changes on your side before the order moves into production.

CashMire Collection’s indicative 35–45-day production period is confirmed against the approved order and material plan. If the specification changes after approval, discuss its effect on that plan. Transport time remains separate from production.